Hasil Evaluasi
NoNama PesertaKualifikasiSkor
Kualifikasi
Alasan
1PT GUNUNG BAJA KONSTRUKSI - 01.071.044.0-055.000 0.00 
2CV. CREATIF ENGINEERING CONSULTANT - 02.828.709.2-102.000 0.00 
3CV. KUTA PASIE DESIGN ENGINEERING - 82.893.433.1-106.000 0.00 
4CV. BATOR ACEH CONSULTANT - 72.356.091.8-101.000 0.00 
5CV. TIARA NAD ENGINEERING - 02.122.211.2-102.000 80,00 
6CV. SEGITIGA EMAS CONSULTANT - 02.689.100.2-101.000 70,90 
7CV. AXIAL HIGHWAY ENGINEERING CONSULTANT - 02.971.067.0-101.000 0.00 
8CV. GAMMA CONSULTANT - 02.150.805.6-103.000 0.00 
9PT. TRAYA MADANI KONSULTAN - 83.842.717.7-101.000 97,90 
10OA Consultant - 75.626.776.1-101.000 67,30