Hasil Evaluasi
NoNama PesertaAdministrasiTeknisSkor
Teknis
Harga PenawaranHarga TerkoreksiPemenangAlasan
1PT. INDOKONSUL CITRAMANDIRI - 02.721.375.0-101.000  91,42      Rp 102.200.000,00       Rp 102.200.000,00   
2CV.GEO PHA KONSUL - 02.078.612.5-101.000  0.00                
3PT. GLOBAL REKAYASA KONSULTAN - 83.349.004.8-101.000  0.00                
4CV. ELEVEN ENGINEERING CONSULTANT - 02.976.382.8-103.000  0.00                
5PT. JAYA TATA BERSAMA - 01.893.313.5-101.000  0.00                
6CV. BATOR ACEH CONSULTANT - 72.356.091.8-101.000  0.00                
7PT. CIKAL TRANSPARANSI KONSULTAN - 74.683.110.6-101.000  0.00                
8CV.KIRANA ASRI KONSULINDO - 03.238.519.7-104.000  0.00                
9CV. SEGITIGA EMAS CONSULTANT - 02.689.100.2-101.000  0.00                
10CV. TRIKARYA PRATAMA CONSULTAN - 02.861.402.2-101.000  0.00                
11CV. ILHAM DESIGN CONSULTANT - 31.621.706.6-106.000  0.00                
12CV. MATARAM DESIGN CONSULTANT - 02.651.274.9-106.000  0.00                
13CV. ABDI MUSA KRAMAPATI CONSULTANT - 01.657.877.5-101.000  0.00                
14CV. MATAURO ENGINEERING CONSULTANT - 01.931.919.3-101.000  0.00                
15CV. MANDIRI DESIGN - 72.344.105.1-107.000  0.00                
16CV. CEUDAH CONSULTANT - 01.658.338.7-101.000  0.00                
17BEUNA ENGINEERING KONSULTAN - 02.689.419.6-101.000  0.00